DPP Guide — Data Requirements

The Textile DPP Data Checklist

Every field a garment DPP needs, in one table: what is mandatory under ESPR Regulation (EU) 2024/1781 today, what is expected from the draft Textile Delegated Act, and what is optional but commercially smart. Sources: ESPR Articles 7 & 10, Annex I, REACH Article 33, and the Apparel & Footwear PEFCR.

Written by Nazrul Islam, Founder, DPPLive · Last updated: 10 July 2026

Data fieldStatusLegal basisWhere it comes from
Unique Product Identifier (UPID)MANDATORYESPR Art. 10(2)Generated per product model by your DPP platform
GTIN (GS1 trade item number)MANDATORYESPR Art. 10 / GS1Issued by your national GS1 office (e.g. GS1 Bangladesh, GS1 Vietnam, GS1 India)
Economic Operator ID (EOID)MANDATORYESPR Art. 10(2)One per company; platform registers it
Facility IdentifierMANDATORYESPR Art. 10(2)One per production site
Registry IdentifierMANDATORYESPR Art. 13Assigned by EU Central Registry from 19 July 2026
Product category & model referenceMANDATORYESPR Art. 7Style number, product group
Country of originMANDATORYArt. 7 / Textile DA (draft)Manufacturing country; state processing steps if asked
Fibre composition (must total 100%)MANDATORYTextile DA (draft) / EU 1007/2011From your BOM; verified against lab test
Recycled content %EXPECTEDTextile DA (draft)Per fibre type, with evidence (e.g. GRS scope)
SVHC declaration >0.1% w/w (name + CAS)MANDATORYREACH Art. 33Screen BOM against ECHA Candidate List (240+ substances)
Chemicals used in processing (CAS)EXPECTEDTextile DA (draft)Dyes, finishes, auxiliaries from dyehouse records
Carbon footprint (kgCO₂eq + method)EXPECTEDArt. 7 / PEF methodApparel & Footwear PEFCR; energy × grid factor (BD: 0.61 kgCO₂/kWh)
Care instructions (ISO 3758 symbols)MANDATORYTextile labelling rulesSame symbols as the physical care label
End-of-life / recycling instructionsEXPECTEDArt. 7 Annex IDisassembly notes, fibre recovery guidance
Repairability informationEXPECTEDArt. 7 Annex IScore or spare-part/repair notes
Durability informationEXPECTEDTextile DA (draft)e.g. wash-cycle performance where tested
Microplastic shedding classEXPECTEDTextile DA (draft)For synthetic-content garments, once the DA defines the test
Certifications (GOTS, OEKO-TEX, GRS, EU Ecolabel)OPTIONALVoluntaryStrong buyer signal; upload scope certificates
Water & energy use per unitOPTIONALVoluntaryFeeds buyer scorecards (Higg-aligned)
Supply-chain tier map (T1→T3)OPTIONALVoluntary / restricted tierVisible only to roles you authorise
How to Collect It

Three Buckets of Effort

Bucket 1
Already in your files
Fibre %, origin, care symbols, certifications, style data — sitting in your BOM, tech packs and certificates. Copy across once; clone per colourway.
~80% of mandatory fields
Bucket 2
Needs structuring
Chemical inventory with CAS numbers from dyehouse and supplier declarations, screened against the ECHA Candidate List. DPPLive syncs the list weekly and flags matches automatically.
1–2 weeks, one-off
Bucket 3
Needs calculating
The carbon footprint: monthly energy consumption × national grid factor, allocated per unit under the PEF method. Enter consumption; the calculator does the method.
Continuous, automated
Checklist FAQ

Quick Answers

What does “expected” mean in this checklist?
+
Fields marked EXPECTED appear in the draft Textile Delegated Act or the ESPR Annex I parameter list but are not final until the Delegated Act is adopted (expected late 2026 / early 2027). Collect them now — every draft iteration has kept them in, and buyers already ask for most of them.
Do I need lab tests for every field?
+
No. Composition should match your existing lab reports and the physical care label; the SVHC screen is a documentation exercise against supplier declarations and the ECHA list, not a new test per style. Testing is only needed where you have no reliable supplier data — typically wet-processing chemistry.
Can I fill this from documents I already have?
+
Mostly yes. A typical factory covers ~80% of the mandatory fields from its BOM, tech pack, care-label spec, and existing certificates. The genuinely new work is the carbon figure (energy data × PEF method) and a structured chemical inventory — the two areas where DPPLive automates the calculation and the ECHA screening.
Is there a downloadable version?
+
Print this page to PDF (Ctrl+P) — the table prints clean. Or run the free readiness assessment: it produces a personalised gap report against this exact checklist, in English, Bangla, Vietnamese and Chinese.
Keep Reading

Related Guides

Identifiers and the GS1 Digital Link carrier that this data hangs from.
Where the identifiers go from 19 July 2026 — the five-step workflow.
Get a personalised gap report against this checklist in 3 minutes.
Contact Us

Get in Touch.
We Respond Within 24 Hours.

📍
Office
Dhaka, Bangladesh
💬
WhatsApp
+8801727268289
Free DPP Readiness Assessment
Not sure where to start? Answer 15 questions and instantly see your compliance gaps — with a downloadable report. Free, 3 minutes — in English, বাংলা, Tiếng Việt & 中文.
Send Us a Message
DPP Guide Regulation Features Demo 📋 Free Assessment Contact News Blog Events Sign In